This project is the first clean coal-fired power station in the Middle East and the first power station in the world to achieve dual-fuel full-load power supply. It consists of 4 sets of 600,000 kW (net output) ultra-supercritical units with the full installed capacity of 2400 MW, possessing 100% output capacity of both firing and natural gas, which has fully meets the supply of different fuels and improves the adaptability of the power plant to fuels. After 4 units are put into operation, they can provide 20% of the power energy for Dubai. The project will be fully put into commercial operation in 2023.